Boards, breakers and changeovers
Changeover switches for generators: how to choose one
What a changeover switch does, single-phase or three-phase, how the amp rating is chosen, and what to tell us when you order one for your generator.
18 November 2026 · 3 min read
If you run a generator when the lights go off, the generator should reach your house through a changeover switch. This guide explains what the switch does and what to decide before you buy one. Fitting it is a job for a certified electrician.
What a changeover switch does
A changeover switch decides where your building takes its power from: the ECG supply or your generator. It sits between the meter, the generator and your distribution board. In one position the building runs on ECG, in the other it runs on the generator, and most have an off position in between.
What matters is that it can never connect both at once. Without a changeover, power from a generator can flow back out along the ECG line, where it can hurt someone working on it. And when ECG power comes back while the generator is running, the two meet, which can damage the generator and whatever is plugged in.
Manual or automatic
A manual changeover is turned by hand. When the light goes off, someone starts the generator and moves the switch across, then moves it back when ECG returns.
An automatic transfer switch (ATS) does this by itself, and is usually paired with a generator that can start by itself. We don't list automatic transfer switches at the moment.
The changeovers we list are Powertec, in two styles, Gear and Rotary. If your electrician hasn't said which to use, ask us before you order and we'll help you choose.
Single-phase or three-phase
The changeover has to match your supply. A building on a single-phase ECG supply needs a single-phase changeover. A building on a three-phase supply needs a three-phase one. If you are not sure which supply you have, your electrician or ECG can tell you. Our guide to SPN and TPN distribution boards explains the difference.
Tell your electrician whether your generator is single-phase or three-phase too. A single-phase generator on a three-phase building is common, and how it is connected is your electrician's decision.
Before you order, tell us whether you need a single-phase or three-phase changeover and we'll confirm the right model.
Choosing the amp rating
We list Powertec changeovers rated 63A, 100A, 125A, 200A and 400A.
All the building's power passes through the changeover, so its rating has to be at least as high as the main switch on your supply. Your electrician will choose it from your main supply and your generator. A changeover rated higher than you need does no harm apart from the cost and size; one rated lower than the supply can overheat.
This guide is general information. Wiring and installation should always be done by a qualified electrician certified by the Energy Commission.